Pneumatic Vacuum Conveyor for Automatic Filling Forming Sealing Packaging Machine

Model NO.: Pneumatic Vacuum Conveyor
Motor Power(kw): 1~10
Installation Slope: 0
Chute size(mm): 3800×960
Overall Dimension: 3920×1640×1320
Weight: 30kg
Trademark: NEWIDEA
Transport Package: Exported Wooden Case
Specification: R375
Origin: China
HS Code: 84224000
Pneumatic Vacuum Conveyor:

1.Pneumatic Vacuum Conveyor is a Pet Food Granule Packing Machine,The machine automatically finish 
   bag making,measuring,filling,sealing,code,counting,and other production process;
2.The fitting packing material are heat-sealed composite membrane coils,lower cost than    
   other materials.
3.Using measuring glasses and former finish the bags.
4.Suit for packing about 1200ml granule products.
5.Suit for automatic packing high flow-able granules such as salt,sugar,rice,bean,nut,melon
   seeds,peanut,oatmeal,tea and part of puffed food,also can pack desiccant washing powder
   and other daily chemicals.
Granule Packing Machine ND-K398EL/Features:
1.Micro computer control system and intelligent temperature control system,and    
   photoelectric tracker.
      
2.With reasonable mechanical structure,main engine speed is under control by turbine
   worm motor and frequency converter.Also in the back of machine,there is a button to
   make speed   adjustment more convenient
      
3.Small noise,stable system and easy operation.
      
4.Double heating rod design, keep the temperature stable,and good shape of bags.
      
5.All the machine is using ss304 stainless steel,healthy,safety,and easily cleanable.

6.The weighing sytem is multihead combination weigher,the weigher can be 4 heads,10
   heads or 14 heads,it depends on your requirement.

Granule Packing Machine ND-K398EL/Material & Samples:

Granule Packing Machine ND-K40/150 Parameters:
Type Bag Length
(mm)
Bag Width
(mm)
Packing Speed
(Bag/hour)
Measuring Range
(ml)
Voltage Power Weight
(kg)
Size
(mm)
Sealing Methods
ND-K40 55-110 30-80 2100-4800 5-40 220V/50/60Hz/1.8Kw 300 850*700*1550 3 /4 Sealing
ND-K150 80-150 30-80 2100-4200 30-150 220V/50/60Hz/1.5Kw 300 850*700*1550 3/4 Sealing
ND-K320I 80-160 60-150 3000-5400 5-300 220V/50/60Hz/2.0Kw 300 950*700*1800 Pillow sealing
ND-K320II 80-160 60-150 3000-5400 5-300 220V/50/60Hz/2.0Kw 320 950*850*1900 3 Sides sealing
ND-K320III 80-160 60-150 3000-5400 5-300 220V/50/60Hz/2.0Kw 350 950*850*1900 4 Sides sealing
ND-K398 30-320 70-210 1800-3600 100-1200 220V/50/60Hz/1.8Kw 350 1200*900*2000 Standard pillow bag
ND-K420 80-300 50-200 300-3000 Max 1200 220V/50/60Hz/2.2Kw 540 1320*950*1360 Pillow bag/Gusset bag/Box bag
Pillow bag with punch hole
Gusset bag with punch hole
ND-K520 100-400 80-250 300-3000 Max 3000 220V/50/60Hz/4.0Kw 600 1150*1795*1650
ND-K720 100-480 180-320 300-3000 Max 6000 220V/50/60Hz/5.0Kw 900 1320*950*1360

Granule Packing Machine ND-K398EL/Why Choose Us:

1.8 years manufacture experience,strong R&D department.
 2.Exported to more than 1000 customers from more than 50 countries.
 3.We promiss machine keep working over 10 years in good working condition.Fewer easy
   broken parts,easy to change.
 4.Intelligent PLC control system,easy operate,more hommization.
 5.One year guarantee time,lifelong free service,24 hours online service.
 6.High output 3000-5000 bags/hour,save energy & labor.
 7.OEM,ODM and customized service.
 8.CE ISO BV GMP certificates.

Granule Packing Machine ND-K398EL/Packaged Goods:

Machine packing inside is plastic films and outside is fumigation wooden case.

Long time cooperation is needed:
Newidea is still developing,and the products are also being innovated.Welcome our old and new customers to visit our factory and make the consultation.We will provide professional packaging solutions for you.
 

Heavy equipment is after reclaiming started vertical or perpendicular to both the horizontal stroke, arrive at the destination after unloading, and air travel to taking place to complete a cycle of work, and then a second lifting or handling.

Photo of our Hoisting Equipment:

Hoisting Equipment

Working principle

The majority of Lifting Equipment in reclaiming began vertical or vertical with horizontal stroke

, arrive at the destination after unloading, and air travel to taking place, complete a cycle of work, and then a second lifting or handling. In general, lifting equipment, materials, transport and unloading is carried out in order, the appropriate agencies work is intermittent. From heavy equipment is mainly used for carrying goods, equipped with bucket can be handling coal, ore, grain, bulk materials, with the container after the lifting liquid steel and other materials. Some lifting machines can also be used to carry people. In some occasions, the lifting equipment or the main operating machinery, such as the loading and unloading of materials in the port and station crane is the main operating machinery.

Heavy equipment principle of work Dadatong addition, here is to briefly introduce our daily use most frequently lift works:

The elevator is composed of a walking mechanism, a hydraulic mechanism, an electric control mechanism and a supporting mechanism. Hydraulic oil by the vane pump to form a certain pressure, the oil filter, flameproof type solenoid valve, throttle valve, liquid control one-way valve, balance valve in hydraulic cylinder is arranged at the lower end of the, the liquid cylinder piston upward movement, lifting a heavy object, the hydraulic cylinder is arranged at the upper end of the oil return the flameproof type electromagnetic reversing valve back to tank, the rated pressure through the relief valve adjustment, through the pressure table observe the pressure gauge readings.

Liquid cylinder piston downward movement, hydraulic oil through the explosion-proof solenoid directional valve into the upper end of the liquid cylinder, liquid cylinder back to the oil through the balance valve, hydraulic control check valve, throttle valve, explosion-proof solenoid valve back to the fuel tank. In order to reduce the weight of stable, safe and reliable braking, the return oil on the way to set the balance valve, balance circuit, to maintain the pressure, so that the decline in speed is not affected by the weight change, the throttle control flow, control the speed of the lift. In order to ensure the braking safety and reliability, to prevent accidents, increase hydraulic control one-way valve, that is, hydraulic lock, to ensure the safety of the hydraulic pipeline burst when the accident can be locked. Install the voice alarm for overload, overload or fault difference.

Electrical control system through the explosion-proof button SB6 - SB1 to control the motor rotation, explosion-proof solenoid directional valve to keep the load increase or decrease, and through the "LOGO" program to adjust the time delay.

Equipment classification

Lifting equipment according to different structure can be divided into small light lifting equipment, lifts, cranes and other types of overhead monorail system. Light from a small heavy equipment mainly consists of lifting pulley, spreader, Jack, manual hoist, electric hoist and ordinary winch, mostly has the advantages of small volume, light weight, easy to use. In addition to electric hoist and winch, the vast majority of the use of human driven, suitable for the occasion of the work is not heavy. They can be used alone, but also as a crane lifting mechanism. Some light small lifting equipment lifting capacity is very large, such as hydraulic jack up to 750 tons of weight. Lift is mainly used for vertical or near vertical movements, with a fixed lift routes, including elevators, lifting platform, mine hoist and bucket elevator, etc.. Crane is in a certain range of vertical lifting and horizontal lifting of heavy lifting equipment.

Basic organization

The use of various lifting equipment is different, there are a lot of differences in structure, but have to achieve the lifting of the basic movements of the lifting mechanism. Some lifting equipment also has the running mechanism, the variable amplitude mechanism, the revolving mechanism or other special working mechanism. The material can be made of wire rope or lifting chain flexible hanging lifting, but also by the screw or other rigid pieces of lifting.

main features

1) lifting equipment is usually huge structure, complex, can complete the lifting movement, the level of movement. For example, the bridge crane can complete lifting, crane operation and the car running 3 movement; Gantry crane can complete lifting, variable amplitude, rotation and cart running 4 movement. In the course of the operation, it is often the movement of several different directions at the same time, the technology is very difficult. 2) a variety of heavy lifting equipment, the load is changed. Some heavy weighing hundreds of tons but thousands, some objects up to tens of meters, shape is also very irregular, shot, hot melt state, inflammable and explosive dangerous goods such as lifting process is complex and dangerous. 3) most lifting equipment and need to run within the scope of a larger space, some should be installed rail and wheel (such as tower crane, bridge crane); some should be installed tires or tracks on the ground walking (such as automobile hoists, crawler cranes, etc.); some need to walk on the steel wire rope, such as passenger and freight ropeway, activity space is larger than 4) some lifting machinery need directly carrying passengers on the guide rail, a platform or wire rope do lifting movement, such as elevators, lifting platform, its reliability directly affects the personal safety. 5) from exposure to heavy equipment, many parts, and often with hoisting workers directly contact (such as hook, wire rope, etc.), the potential many accidental risk factors. 6) the working environment is complex. From the large integrated iron and steel enterprises to the modern port, construction sites, railway hub, tourism resort, there are heavy machinery in operation; workplace often in case of high temperature, high pressure, flammable and explosive, transmission lines, strong magnetic and risk factors, the equipment and operating personnel formed the threat. 7) in the heavy industry, often need to cooperate with the common. An operation, requires the command, banding, driving and other operators with proficiency, action coordination, mutual care. Operators should have the ability to deal with emergency situations. The close cooperation between multiple operators, there is usually a big difficulty.

Operating procedures

Article 1: all kinds of cranes should be installed, marked with the sign for the mechanical properties, and according to need to install the hoisting limiter, load controller, interlock switch device and rail mounted crane should be placed walking limiter and rail clamping, before use should check the trial lift.

Second: the wire rope in the drum must be arranged neatly, the tail of the card, the work of the minimum retention of more than three.

Third: shall not arbitrarily change the performance of the crane.

Fourth: in the operation of the command to listen to the signal, the signal is unknown or may cause accidents should be suspended operation.

Fifth: when lifting, lifting objects do not have to stop and walk.

Article 6: lifting objects should pull ropes, speed should be uniform, smooth, no suddenly brake and transform the direction and lifting objects should be higher barrier about 0. More than 5 meters, whereabouts should slow light, prevent dumping.

Seventh: when lifting objects, the ban stand on an object.

Article eighth: the establishment of crane maintenance, regular inspection, safety regulations, and earnestly implement the relevant personnel education.

Ninth: bridge crane should be set up full-time driver to drive, there is someone to be responsible for the hook and command (need to have the operating permit). Driving without a license and command.

Tenth: the crane's working place should have enough lighting equipment and smooth transportation channel. Suspended from the head above the suspended.

Eleventh: the obvious part of the crane indicates the maximum weight, prohibit overload use.

Maintenance

No matter what is the industry, in the use of heavy equipment to make a safety check for the lifting equipment and lifting equipment were a repair and maintenance, timely detection of abnormal situation, and timely treatment, ensure heavy machinery safe operation, to avoid any accidents occur. Put some hidden dangers in the bud in the eradication of the state, so that not only is responsible for the progress of the project, but also responsible for the lives and property of the construction personnel.

One, from the following three aspects to ensure the need to check the cause of heavy equipment:

1, check up the heavy equipment all types of protective cover, guardrail, door plate, ladder etc. whether complete, reliable, crane exposure may cause winding wounding, open transmission; coupling, sprocket, a chain, a transmission belt to rotate spare part protective cover, crane passage ladder and may cause personnel exposed parts of the door bar, whether to meet the requirements.

2, the open pit as a crane electrical equipment should be protected rain cover.

3, brake, brake pattern meets the design requirements, the brake pull rod, a spring without fatigue deformation, cracks and defects; pin shaft and the spindle, brake wheel, brake friction or excessive wear, hydraulic brake is oil; brake clearance adjusting system, ability can meet the requirements.

Hoisting Equipment

Lifting Equipment,Lifting Gear,Lifting Devices,Hoisting Equipment

Unisite Group Ltd. , http://www.unisitemarine.com