Deck fire in Prospect Heights, 8-9-18

From the Prospect Heights Fire District:

Fire companies were dispatched to a reported structure fire at the listed location. Upon arrival, crews were informed by dispatch that the fire had already been extinguished and was located on the rear deck. A follow-up investigation revealed that a smoldering fire from a planter box had fallen onto the rear balcony deck, causing a small fire. Firefighters removed a section of the deck board along with some trim to ensure no further spread, then thoroughly washed down the area and confirmed full extinguishment.

On-scene units included: Prospect Heights Engine 9, Tower 9, Engine 39, Battalion 9, and Engine 900. Wheeling Engine 23, Mobile Tower 13, and Mobile Apparatus 14 also responded to the scene.

Prospect Heights fire engine on the scene at Rob Roy

Drew Smith photo

Firefighters overhaul deck after a fire

Drew Smith photo

CAD printout of Prospect Heights FD incident

CAD printout

This incident highlights the importance of quick response and thorough investigation. Even though the fire was initially reported as under control, the firefighters' attention to detail ensured that all potential hazards were addressed. The community is reminded to be cautious with outdoor fires and to keep flammable materials away from decks and buildings. Thanks to the quick actions of the first responders, no injuries were reported, and the damage was minimized.

Copper Plating Welding Wire

Features:

ER70S-6 is a kind of mild steel copper coated Welding wire, suitable for 100% CO2 and Argon& CO2 mixed gas protective welding with stable feasibility, good welding seams, less spatters and excellent welding process properties.


Application:

Used to weld ship building steel(A,B,D,E,A36,D36,E36)and equivalent mild steel or 550Mpa grade mild alloy steel, such as container building, construction machine, railway construction, pressure vessel for semi-auto or automatic gas shielded welding.

1. Wire into the plant must be stored in dry conditions, can not open welding wire coil waterproof packaging.
2. Welding shall be removed before welding surface oil, rust, water and other impurities.
3. The CO2 gas protection, CO2 gas purity 99.98%.
4. CO2 welding protective gas flow rate should be controlled at 20~25L/min.
5. Wire extension length should be controlled in the range of 15~25mm.


Copper Plating Welding Wire ,Mig Welding Copper Wire,Copper Plating Wire,Copper Plating Welding Wires

Jiangyin Vankey Machinery Technology Co.,Ltd , https://www.wkweldingwire.com